There is No Substitute
For Experience

Since no two projects are ever alike, we use our tremendous depth of knowledge to tackle any project. We are always on the cutting edge, utilizing new rigging, contracting, and crane technology and machinery to service our client’s array of needs.

Equipment Moving & Alignment Blog

Professional Millwright Service and Equipment Moving

Fenton has been a trusted name in rigging and contracting in Cincinnati since 1898, offering expert millwright services and machinery-moving solutions. Whether you need full relocation services, heavy machinery movers, or precise alignment of machinery, our skilled team is equipped to handle the most demanding projects.

L Photo-Over 1000

Crane Rental

Fenton has been a cornerstone of industrial rigging and contracting since 1898. With over a century of expertise, we provide unparalleled crane services that ensure your projects are completed safely, on time, and within budget.

Trilifter

Trilifter

With Fenton's powerful Trilifters, limited space doesn’t constrain heavy equipment moving and installation plans. Configured as mobile gantries or forklifts, the Trilifter unlocks new possibilities for maneuvering oversized loads into even the tightest areas. As Cincinnati's only provider of these highly specialized lift machines, we offer an unrivaled ability to meet your job's unique demands.

Traksporter

Traksporter

Streamline your heavy machinery moves with unmatched efficiency and safety with Fenton. The Traksporter–a remote-controlled, self-propelled crawler system–allows us to precisely position your largest equipment through even the tightest spaces.

History 2

St. Elizabeth Project

Our team assembled the perfect one-two equipment punch for this challenging job: a 130-ton crane providing the heavy muscle to lift and place the massive new boiler units, complemented by the compact yet mighty Traksporter crawler system to navigate tight spaces and relocate components. But machine prowess was only one aspect of ensuring success.

Millwright

Millwright

Central to our offerings is the cutting-edge Rotalign laser alignment systems. Combining these powerful tools, \ with our team's expertise enables micrometer-level precision alignments that maximize the efficiency and longevity of your facility's mission-critical machinery.

History 1

130-Ton Crane

When your project demands heavy muscle combined with surgical precision, Fenton's mighty 130-ton crane. Sporting an impressive 170' main boom, this engineering marvel is designed for peak performance, utilizing a lightweight yet strong boom construction that maximizes lifting capacities.

More of our Projects

PYRAMID HILL SCULPTURE MOVE

Fenton Rigging & Contracting, Inc. was recently tasked with moving two sculptures from Pyramid Hill to the Cincinnati Art Museum.  Fenton utilized a variety of equipment to move the sculptures, specifically its new Tadano ATF-110G-5 crane.  The pieces were relocated to their temporary new home meeting all of the customer’s expectations.  WKRC Cincinnati covered the story as can be seen here.

FILTER PRESS INSTALLATION

Fenton Rigging & Contracting, Inc. partnered with a local mechanical contractor to deliver and set a 32,000 lb. filter press on an elevated platform.  Getting the press into its current location meant overcoming several obstacles.  The platform is located in a tight space and didn’t leave room to utilize conventional rigging methods.  Coupled with the limited headroom that prevented any lifting from overhead, Fenton employed its 75-ton Tri-Lifter to get the job done, safely and on-time!

MARLEY COOLING TOWER

Off load, set and place cooling tower units on pad.

BRIDGE EXCHANGE

Fenton performed a 24-hour bridge exchange for a Class I Railroad.  The total weight of the old bridge was nearly 300 tons.  Fenton utilized two 550-ton hydraulic cranes with mega wings in order to maximize time and create efficiency for the railroad.  In addition, Fenton replaced the old back-walls with new precast concrete.  To complete the project, Fenton assembled and slid into place the new 450 ton bridge to accommodate the newer, heavier requirements of the railroad.

Millwright

CASE LINE MACHINING OFFICE BUILDING RELOCATION

Reinforced structure, jacked unit up, inserted skates underneath frame and pushed 14 bays to new location.  Set in place, removed all bracing and installed new trim and painted.  This was one of two building moves.  Customer saved 150K dollars with this plan Fenton had designed.  This task was nominated for an award and has since been replicated at other facilities.

COOLANT TANK EXCHANGE

Coolant Tank Exchange Job. Rig out old tank, rig and set new one. 50/70K Heavy Forklift, 40/60K Heavy Forklift, Traksporter.

HELICOPTER LIFT DOWNTOWN CINCINNATI

HELICOPTER LIFT STRUCTURAL STEEL