US Bank Tower Chiller Helicopter Lift
- Location : Downtown Cincinnati, Ohio
- Fenton Project Manager : Bob Lee
- Fenton Foremen : Jon Wurzelbacher and Jim Schoborg
City permits. Street closings. Police blocks. Fenton's US Bank Tower Chiller Helicopter Lift was a veritable action film, and we were asked to seamlessly manage the logistics. Subcontracted by a mechanical contractor to remove existing chiller parts and set new cooling towers on top of a downtown office building, we provided lift operation within all FAA requirements by contracting Erickson Air Crane. Fenton crews rigged all the equipment on the ground needed for the 12 lifts to US Bank Tower and handled the rigging on the rooftop. End result—a successful flight.