US Bank Tower Chiller Helicopter Lift

  • Location : Downtown Cincinnati, Ohio
  • Fenton Project Manager : Bob Lee
  • Fenton Foremen : Jon Wurzelbacher and Jim Schoborg

City permits. Street closings. Police blocks. Fenton's US Bank Tower Chiller Helicopter Lift was a veritable action film, and we were asked to seamlessly manage the logistics. Subcontracted by a mechanical contractor to remove existing chiller parts and set new cooling towers on top of a downtown office building, we provided lift operation within all FAA requirements by contracting Erickson Air Crane. Fenton crews rigged all the equipment on the ground needed for the 12 lifts to US Bank Tower and handled the rigging on the rooftop. End result—a successful flight.

US Bank Tower Lift (1) US Bank Tower Lift (8) US Bank Tower Lift (10) US Bank Tower Lift (4) US Bank Tower Lift (5) US Bank Tower Lift (6) US Bank Tower Lift (7) US Bank Tower Lift (2)
Right Photo

Contact Us








Testimonials

“This is to compliment you on the excellent employees you have… Their professionalism, skill level, high energy level and continuous ‘can do’ attitude made it a pleasure to work with them. Those that know me know that I don't give compliments often or without forethought. I look forward to working with you again in the future.” - Gary Gisbert, Field Maintenance Representative